Production ran at Welded Tube’s U.S. facility. Customers got their tubing. Plant Manager Steve Vanaskie couldn’t see, on any given morning, which issues from the day before were still open, what the outgoing shift had learned, or whether two supervisors ran the same check the same way.

Gaps like that surface when the same problem comes back a third time, or when an experienced operator leaves and takes the fix with him.

About Welded Tube

Founded in 1970 and headquartered in Concord, Ontario, Welded Tube produces steel tubular products across five manufacturing and finishing facilities in North America. It runs three divisions: Energy Tubulars, ERW (electric resistance welded) Mechanical, and HSS (hollow structural sections). The company is a member of the Canadian Steel Producers Association (CSPA).

This story covers the U.S. facility, the company’s only plant in the United States, run by Plant Manager Steve Vanaskie. The site has used Tervene since 2022.

What the plant set out to fix

The site carried the kind of operational drag that never triggers an alarm: issues nobody logged, knowledge that didn’t survive a shift change, and leadership routines that varied by supervisor from the floor to the plant office. Left alone, those compound.

Three objectives went into the project:

  1. Standardize management routines and communication.
  2. Get real-time visibility into operations and key performance indicators (KPIs).
  3. Resolve problems faster, with clear ownership.

What they run in Tervene

It’s fully integrated. It is how we operate on a day-to-day basis to manage our operations here.

  • Steve Vanaskie, Plant Manager, Welded Tube USA

One dashboard, two kinds of daily meetings

The day starts with the daily operations meeting. A few days a week, it runs in a conference room with colleagues in Canada on the line. The other two days it runs out on the floor, so the people working the production line take part. Both versions use the same dashboard.

Five processes run through those meetings:

Tier 1 SQCDPM board showing safety, quality, cost and delivery indicators with assigned actions

Audits, checklists, and where the findings go

Setup audits run every shift, checking the line against the specification it should be running to. Alongside them: LPAs, 5S audits, personal protective equipment (PPE) audits, changeover audits, and the maintenance technicians’ daily rounds.

Those rounds capture process data. Each one records the operator, the shift, readings such as coolant concentration, anything needing follow-up, and the work completed that day. Supervisors review them.

What keeps the system running is what happens to a finding. An issue raised during an audit becomes an action with an owner and a due date, and completion is tracked. Actions a supervisor raises populate the shift handover space automatically, so the next shift starts from what the last one found. Nothing depends on someone remembering to pass it along.

Building a digital audit checklist in Tervene's form builder

The Knowledge Base

The team built a space they call the Knowledge Base. It does three jobs.

We assign that to each supervisor to have their folks go over that. They have to sign a hard copy of it and then once that’s complete, they complete the action. So we know that everybody is signed off on it.

  • Steve Vanaskie, Plant Manager, Welded Tube USA

Every plant has the same underlying problem. The person who knows how to clear that fault at 2 a.m. eventually leaves. Writing the fix down where the next shift can find it is how the plant keeps it.

Where the site stands today

The site now runs its daily management of safety, continuous improvement, maintenance, and quality in Tervene. Every month, Welded Tube completes hundreds of digital checklists and closes out thousands of actions.

Daily huddle dashboard in a daily management system, showing the day's agenda and open items

Where the site goes from here

The system is in place and running daily. What Steve is working on now is how the meetings use it.

One area we need to work on is to focus our meetings more on the actions and less on the metrics.

  • Steve Vanaskie, Plant Manager, Welded Tube USA

Deploy the same standard at your sites

Welded Tube’s U.S. plant built its daily management system one routine at a time. Meetings first, then audits, then the Knowledge Base behind both. Each piece holds because it runs the same way every day, on every shift, no matter who is in charge.

Book a demo to see how Tervene can standardize daily management and scale operational excellence across your sites.